Dry Creek Greenway Bike Trail
A Place for Bicycling, Walking, and Running
This 4.25-mile trail project along several creeks in the City of Roseville provides residents a place for bicycling, walking, and running. The project included six new bridge crossings, bridge widening, undercrossings for existing bridges, and numerous retaining walls. During the Preliminary Engineering and Environmental Document Phase, Psomas was responsible for the overall management and coordination of the project.
An extensive public outreach program was a major factor in the development process. Psomas also assisted the City in successfully receiving $4.5 million in Active Transportation Program (ATP) funding.
Services
- Bridge Design
- Cost Estimating
- Public Outreach
- Environmental Clearance