Skip to content
Mojave Solar

Mojave Solar Project

Powering 88,000 Households; Preventing 329,000 Metric Tons of CO2 Emissions

This $1.2 billion solar project is generating enough electricity to power about 88,000 average households while preventing 329,000 tons of CO2 emissions from entering the atmosphere. The 250 MW facility will generate solar electric through twin 125 MW power islands and will solar heat a heat transfer fluid to generate steam in generators.

Psomas provided surveying and construction staking services for this 1,765 acre project site near Barstow, California.

Services

  • Survey
  • Construction Staking

CLIENT

Abener Teyma Mojave

LOCATION

Mojave Desert, CA

MARKET

VIEW NEXT
Back To Top
Search