Traffic Engineering

Santa Monica Boulevard Pedestrian and Signal Improvements | Santa Monica, CA

Client
City of Santa Monica

Services

Traffic Engineering
Signal Modifications
Intersection Improvements
Community Outreach
Construction Management


Improvements at 15 Intersections

As part of an on-call contract with the City of Santa Monica, Psomas was selected to provide traffic engineering, construction management, community outreach, and inspection services for the Santa Monica Boulevard Improvement project. It involved three components: advanced traffic management system communications, traffic signal modifications at 15 intersections, and street and pedestrian intersection improvements.

The primary Traffic Management Controls were tied in at City Hall, along with a secondary hub at the City Library. The project also included re-striping, installation of video detection systems, abandonment of existing loop detection systems, street and pedestrian improvements, and installation of ADA ramps.



Top