Water Engineering

San Lucas Development Water Facilities | Marana, AZ

Client
BCIF Group

Services

Civil Engineering
Hydraulic Analysis


Water System Infrastructure for New Development

Psomas was retained to prepare a study and design subsequent water system infrastructure for the proposed 834-lot, 292-acre San Lucas residential development.

A detailed Master Water Study was prepared including well siting analysis, calculation of required storage and ultimate demand, and hydraulic analysis of the proposed water system layout. Psomas designed a 2,500 GPM booster station, including a new groundwater well and a 1.0 MG above-ground storage tank.



Top