Veterans Administration GLA North Campus Water Distribution System
About the Project
The Veterans Administration West LA Campus Infrastructure project separates the existing combined fire suppression and potable water pipeline system serving the North VA Greater Los Angeles Campus into two parallel, dedicated systems. The work also establishes two pressure zones with new pressure-reducing stations between zones, installs new valves for both systems, and adds new fire hydrants connected to the dedicated fire suppression system. Two new connections to the existing County water main along San Vicente Boulevard help meet fire flow requirements, while reconfigured on-campus water storage tank facilities support the transition to separate potable water and fire suppression systems. Psomas planned and designed potable water and fire service connections to existing and planned VA campus buildings, with capped service stubouts strategically located and sized for anticipated future connections without requiring future excavation or disruption to the new pipelines. Proposed pipeline alignments and depths were developed to accommodate future roadway realignments, utility relocations, grading, and third-party utilities while supporting ongoing construction phase services for both Phase 1 and Phase 2.
