Tangerine Road Widening

About the Project

The five-mile Tangerine Road Widening passed through the jurisdictions of the Town of Marana, Pima County, and the Town of Oro Valley, with all three partners forming a Technical Advisory Committee to guide the roadway design. Psomas prepared final design plans to reconstruct and expand Tangerine Road from two lanes to four between Dove Mountain Boulevard and La Cañada Drive. Major elements included a raised median, bike lanes, sidewalks, a multi-use path, 40 new and extended cross culverts, wildlife fencing and crossings, and extensive reconstruction on four major side streets. Delivered through the Construction Manager at Risk method, the project included close coordination with the selected contractor to pursue value engineering and develop a phased Guaranteed Maximum Price, enabling preliminary construction to begin early. The work supports improved safety, mobility, drainage, multimodal access, and habitat protection across a regional corridor.

 

Additional Services Provided: Structures, Stormwater & Drainage, Traffic Engineering, Water & Sewer Utilities

Client

Town of Marana

Location

Marana, AZ

Awards

ACEC, ADOT, AGC, Maricopa County, AMCA, FHWA, APWA, ATB - Arizona Transportation Partnering Excellence Award - Roadway Over $25 Million (2018) Pima Association of Governments - Timothy M. Ahrens Partnering Award (2019) APWA Arizona - Project of the Year, Transportation, $25-$75 million (2019) APWA Southern Arizona Branch - Project of the Year, Transportation, $25-$75 million (2019) APWA - Project of the Year, Transportation, $25-$75 million (2019) International Partnering Institute (IPI) - Partnered Project of the Year Award, Diamond Level, Civil Construction Projects: $25M - $250M (2019)

Markets

Transportation