South Coast Water District Lift Station Replacement
About the Project
For the South Coast Water District Lift Station No. 2 replacement, Psomas is overseeing construction monitoring while providing environmental compliance support during construction. The project includes demolition of the existing lift station and facilities, permanent realignment of Country Club Drive, replacement of the existing drainage outlet into Aliso Creek, installation of a new odor control scrubber, and an intertie connecting sewer pipelines. Psomas is providing archaeological and paleontological resources monitoring and reporting, worker education training and awareness for SCWD staff and contractors, coordination with Tribal Representatives assigned to the project, and documentation in a post-construction report to meet mitigation measure requirements. The team is also providing biological pre-construction surveys for special-status plants, special-status herpetofauna, nesting birds, and coastal California gnatcatcher.
