City of San Diego Mid-City Pipeline Phase II

About the Project

This project, located in the cities of La Mesa and San Diego, consisted of the installation of 6,000 LF of 66-inch diameter welded steel pipeline containing approximately eight butterfly valves. The pipeline runs from the Alvarado Water Treatment Plant in La Mesa, south down Lake Murray Boulevard and into the City of San Diego, terminating in El Cajon Boulevard. The project required construction in heavily traveled roadways and narrow streets, including the redesign and relocation of two existing Helix Water District pipelines in Lake Murray Boulevard, Wisconsin Avenue, and Arizona Avenue. To minimize construction impacts, the alignment featured three trenchless crossings including one under I-8 and the MTS trolley tracks and two located under San Diego County Water Authority facilities. The project required extensive community engagement and coordination with agencies such as Caltrans, MTS and Helix Water District.

Additional Services Provided: Structures, Traffic Engineering

Client

City of San Diego - Public Works

Location

San Diego, CA

Markets

Water