Manzanita Reservoir Drive 24-inch Main Relocation

Sunset over Tucson, AZ shot from Redding Pass road.

About the Project

West of Manzanita Reservoir, channel incision in an unnamed wash exposed a significant portion of an existing 24-inch supply main between East Ozona Place and North Manzanita Avenue, making replacement necessary. Psomas is supporting Tucson Water with expedited water plans and special provisions for approximately 800 feet of new 24-inch supply main designed to Tucson Water standards and coordinated with an existing shutdown window tied to reservoir rehabilitation. The project requires coordination with Tucson Water, the Department of Transportation and Mobility, and landowners, along with right-of-way, field survey, legal descriptions, utility base mapping and coordination, design documents, PDEQ approval, construction staking, As-Builts, and oversight of geotechnical and cathodic protection subconsultants. By aligning the replacement with the reservoir schedule, the work addresses an exposed pipeline segment while supporting long-term water system reliability. 

Client

Tucson Water

Location

Tucson, AZ

Markets

Water