Franklin Street Improvements
About the Project
As part of Olympia’s 2017 Downtown Strategy, Psomas led design and construction management for the first of four planned downtown improvement phases: a full rebuild of Franklin Street from Legion Way to State Avenue. The project replaced aging asphalt with a 40-year cement concrete roadway, upgraded three signalized intersections, added curb bulbs to calm traffic and shorten crossings, installed ADA-compliant ramps, sidewalks, street and pedestrian lighting, landscaping, colored crosswalk treatments, and improved access to the InterCity Transit Center. Below the surface, Psomas coordinated water mains, storm drainage, irrigation, and LED illumination so infrastructure needs were addressed holistically rather than in isolated pieces. The work also required construction-phase judgment during pandemic conditions, supply chain shortages, heat emergencies, and unexpected archaeological discoveries. Completed only 19 days beyond the original contract timeline, Franklin Street shows how design, construction management, utilities, streetscape, accessibility, and transit access can come together in a compact downtown corridor.
Additional Services Provided: Stormwater & Drainage, Traffic, Transportation, Water & Sewer Utilities, Landscape Architecture / Urban Design