Dry Creek Greenway East Class 1 Multi-Use Trail
About the Project
Phase 1 of the Dry Creek Greenway East project provides a three-mile Class I multi-use trail along the greenways of Dry, Cirby, and Linda Creeks. Psomas prepared preliminary engineering, environmental documents, and final design for the trail, which will extend the existing trail network and connect downtown Roseville to the southeastern portion of the city. The project follows Dry Creek, Cirby Creek, and Linda Creek and includes design of twenty-two retaining walls, three new pedestrian bridges, and one bridge widening. The result is a continuous multi-use route that supports walking and biking along the creek greenways while fitting new trail infrastructure into the corridor.
Additional Services Provided: Stormwater & Drainage, Transportation