Cleveland Street Promenade

About the Project

Cleveland Street was once a fast-moving one-way former state route that cut through downtown Redmond rather than connecting it. With few safe pedestrian crossings, no pedestrian lightening, and narrow sidewalks, the street could not support the foot traffic a historic district needs to thrive. Psomas assisted the City in securing federal funding, then led full design and construction administration for 1,300 linear feet of reimagined street, converting the corridor into a two-way, curbless promenade designed for people as much as vehicles. The project included raised intersections, midblock crossings with artistic catenary lighting, 14-foot sidewalks, a new water main, undergrounded franchise utilities, traffic signals, pocket parks, plaza spaces, Pacific Northwest plantings, street trees, pedestrian lighting, and rain gardens. The team also addressed accessibility in the curbless environment through a site walk with The Lighthouse for the Blind, then integrated tactile pavers, planters, and raised curbs to create a continuous detectable edge. The work brought transportation, urban design, utilities, accessibility, lighting, and construction administration together to extend downtown public life beyond the park. 

Additional Services Provided: Survey, Transportation, Traffic Engineering, Stormwater & Drainage, Water & Sewer Utilities 

Client

City of Redmond

Location

Redmond, WA

Awards

2019 APA Great Streets Award

Markets

Transportation