AES Alamitos Battery Energy Storage System
About the Project
Completed in 2020 in Long Beach, the AES Alamitos Battery Energy Storage System was the first stand-alone energy storage project in the United States built specifically in place of a new natural gas peaking plant. The 100-megawatt, 400-megawatt-hour facility is one of the largest battery storage systems in operation in the world. Psomas provided civil engineering and survey services for the expansion, including supplemental site and building survey, utility investigation, grading and drainage, wet utility, demolition, precise grading and drainage, on-site sewer, and storm drain plans. The scope also included hydrology and hydraulic studies, horizontal control, erosion control and SWPPP, a Low Impact Development report, fire protection master planning, on-site signing and striping, project specifications, earthwork calculations, plan processing and agency review, project management and coordination, and construction support. Together, this work supported the expansion of AES’ energy storage facility and compliance with current codes in the Long Beach area.
Additional Services Provided: Stormwater & Drainage